Chiller Replacement
Client: The Heart Hospital | Sector: Healthcare
This scheme involved the replacement of two 440kw ducted chillers with 6nr smaller chillers set within the same footprint at the Heart Hospital in Westmoreland Street, London.
The existing chillers had reached the end of their useful life and needed urgent upgrade. By using six smaller chillers in their place we have not only reduced the energy consumption but have increased resilience via a non-sequential start sequence.